Email for prpduct updates
Give us a call on 099720356

News & Project Profiles


Landng Rd Walkway.jpg

Landing Road Walkway

gripsert specified for TITIRANGI's landing road walkway - a 245 metre AUCKLAND COUNCIL track . . .

Reaching a height of 55metres, this walkway covers a steep and winding route linking Tangiwai Reserve and Grendon Rd - Slip-resistance and minimum maintenance were important factors . . .

>> Click here to read more about this project


GRIWaiataReserveBridge2.jpg

WAIaTA RESERVE BRIDGE

Waiata Reserve bridge upgraded with gripsert

The Waiata Reserve, located off Victoria Ave in Remuera, is a popular park with locals - With a mix of level and steep paths, it's suitable in all weather for most ages, levels of fitness and mobility. Pedestrian safety was a key concern . . .

>> Click here to read more about this project


Parrs_Park_Henderson_2.JPG

Gripsert for popular parrs park walkway . . . 

GRIPSERT WAS SELECTED BY AUCKLAND COUNCIL FOr sections of the popular parrs park walkway.

Parrs Park offers the community a combination of walking and cycleway tracks, childrens' playground and areas of native bush, wetland and stream. . .

>> Click here to read more about this project


Routley_Dr_path_005.jpg

ROUTLEY RD WALKWAY

Gripsert supports In tree conservation

Laying a concrete footpath along a section of Glen Eden's Routley Drive proved a challenge due to positioning of a large native tree - Digging would have damaged its' roots so another solution was needed. . .

>> Click here to read more about this project


Lloyd_Elsmore_Park_Bridge.jpg

LLOYD ELSMORE PARK

Upgrades to a cable-stayed bridge called for a durable product that would last well with high volume foot TRAFFIC.

The project  involved remedial work, with a surface upgrade to the boardwalk and other park developments. . .

>> Click here to read more about this project


Arataki3.jpg

ARATAKI VISITOR INFORMATION CENTRE

Gripsert and Retrogrip prove their durability

Five years ago both products were chosen for upgrade of the Information Centre entrance walkways and deck - They're still serving well . . .

>> Click here to read more about this project


Picton_Bridge_construction_pic.JPG

PICTON BRIDGE

the Picton coathanger bridge specified a 1/ 5 gradient - Gripsert was the only product that came close to this at 1/ 4.8

It also needed a surface solution that was low maintenance and high on safety . . .

>> Click here to read more about this project


Kaurilandswalkway.jpg

KAURILANDS RESERVE

long-lasting, low maintenance surface needed for pedestrian track rebuild . . .

Waitakere's Kaurilands Track is a sloping and partly shaded, raised boardwalk that gets a high level of community use, especially by school children. . .

>> Click here to read more about this project


DonBuckPrimarySchool.jpg

DON BUCK PRIMARY SCHOOL

Waitakere Architects specified Gripsert for a site-wide accessibility upgrade to don buck school.

The main construction was a 20metre two-way ramp, and a landing built from the classrooms to the school grounds. . . 

>> Click here to read more about this project


EpsomGirlsGrammar.jpg

EPSOM GIRLS GRAMMAR

GRIPSERT SPECIFIED FOR A series of 9 metre accessibility ramps at Epsom Girl’s Grammar.

Often exterior grade carpet is laid as a surface to ramps to increase slip resistance, but it can stretch and tear over time  . . 

>> Click here to read more about this project


Waiheke_School_ramp1.JPG

WAIHEKE ISLAND HIGH SCHOOL

special needs modification involved ramp construction for access to classrooms.

Gripsert was specified because of its’ low maintenance, long life, and slip-resistant surface.

>> Click here to read more about this project


Wave_Pool_Track_Retrogrip_004.jpg

HENDERSON WAVE POOL TRACK

a solution was sought to improve pedestrian safety alongside Waitakere's West Wave Complex.

Retrogrip was chosen for it's slip-resistance and ease of installation. . .

 

>> Click here to read more about this project


Taikata_Rd_Steps.jpg

Taikata Rd Steps, Te Atatu Peninsula

gripsert is made from marine grade aluminium, making it ideal for coastal tracks . . .

The Taikata Rd steps are part of the Te Atatu Coast Walkway running along the Te Atatu Peninsula. Gripsert was specified for the steps and sections of the track . . .

>> Click here to read more about this project


CorbanEstateGripsert2.jpg

CORBAN ESTATe

GRIPSERT FOR popular Arts Centre bridge & Boardwalk. .

The historic Corban Winery Estate in Waitakere City is home to a popular community Arts Centre - With galleries and Artist's Studios it's an area of high foot traffic all year round . . .

>> Click here to read more about this project


Lake_Wainamu_Boardwalk_Retrogrip.JPG

Lake Wainamu Track

Retrogrip improves slip- resistance for walking track boardwalks 

Lake Wainamu Track is a 4km track leading from the carpark on Bethels Rd up to the Lake, with boardwalks crossing the Wainamu Stream. . . .

>> Click here to read more about this project


Piha7.jpg

Piha Rd footpath/ boardwalks

Gripsert improves Walkway facilities for residents

A community request for improving Piha walkway facilities saw Gripsert as part of the solution - With steep land and drop-offs, the project called for a mix of footpaths and boardwalks . . .

 >> Click here to read more about this project